    The stone for the waterfall feature of the pond has been delivered and the install is coming along well. Now we can also focus on the mechanical equipment to make…

  • Read More  

    Still Coping

    3380 Craigend

    Once again we have set up for another concrete pour. This time it is the pool and deck coping. It is a small pour with big consequences as it will…

  • Read More  

    Applianced

    3380 Craigend

    Appliances have been delivered and installed and ready for some good homeowner use. Now if we could only find where we put them…

  • Read More  

    Blinded by the Light

    3380 Craigend

    Not likely anymore. This week the motorized blinds are being installed so the various trades can nap effectively during the noon siesta. We are not sure whether this will actually…

  • Read More  

    Floating Staircase 

    3380 Craigend

    After approximately 2 months of finishing woodwork, the interior staircase is now complete. Many complicated details and angles have been sorted out by Rob, Kris and Roy and the end…

  • Read More  

    Bar Counters

    3380 Craigend

    The last of the countertops were installed today – allowing for measuring the final round of interior glass. 

  • Read More  

    More Millwork

    3380 Craigend

    The millwork is extensive and ongoing. We have 2 crews installing and every day brings a new surprise. Extensive and intricate, it’s all coming together. 

  • Read More  

    Garage Fascia

    3380 Craigend

    The metal fascia on the garage is now complete and a few damaged areas have been repaired. The only remaining metal detail left to be done is finishing the main…

  • Read More  

    More Bar

    3380 Craigend

    I believe we are down to 3 more concrete pours for this house (of approximately 30 total). The back deck area has been levelled and rebar has been installed to…

  • Read More  

    Counters

    3380 Craigend

    The countertops started arriving in earnest this week. All the main and upper floors are completed with only the basement bar remaining. 

  • Read More  

    Light my Fire

    3380 Craigend

    The fireplaces were finished today. Now that it is summer, we can turn them all on and then test the power of the air conditioning system. 

  • Read More  

    Lost in the Woods

    3380 Craigend

    15 large maples are part of the planting plan. This week they are being installed and the effect has been dramatic. The house has now been hidden by the trees. 

  • Read More  

    Planter Paradise

    3380 Craigend

    Much work has been done to tier the south side of the property in order to support a more horizontal planting pattern. The last level of the concrete walls support…

  • Read More  

    Re Grade

    3380 Craigend

    We are just about ready to deal with the driveway once and for all. A regrade was in order to maximize the access potential for our remaining tasks. It’s now…

  • Read More  

    Maples

    3380 Craigend

    We have 15 or so maples to be planted on the site and the first shipment arrived today. Nice looking specimens!

  • Read More  

    After

    3380 Craigend

    It may seem a little silly but there is a trade who’s sole purpose is cleaning and sealing stone. With the limestone on this house it makes a big difference…

  • Read More  

    Limestone Walls

    3380 Craigend

    Most of the exterior limestone cladding is now complete. The sections still need to be cleaned, sealed and caulked but the look of the house is really coming together. 

  • Read More  

    Basement Bar

    3380 Craigend

    The bar cabinets for the basement are coming together. Should now be ready for tomorrow’s countertop measure. 

  • Read More  

    Getting Green

    3380 Craigend

    The hardscaping has been ongoing soon after the house foundation was complete and we are now just starting to witness the impact of a little greenery. It is definitely softening…

  • Read More  

    LED Heaven

    3380 Craigend

    We have led light strips thruout the house design and the electrician has started to get that install fully functional. Looks pretty cool!

  • Read More  

    Framing Again

    3380 Craigend

    It’s taken us quite a while to get back to framing the garage but the process is now really underway. Due to access issues, the garage has had to wait…

  • Read More  

    Garage Slab

    3380 Craigend

    The garage floor slab was poured today. This is the last step in starting the garage framing which is now imminent.

  • Read More  

    Slab Pour

    3380 Craigend

    Big step today. Getting the concrete poured and placed in the basement will allow us to move forward with framing the remaining walls and the carrying on with the various…

  • Read More  

    Radiant City

    3380 Craigend

    The basement slab area has been prepped with 10″ of levelled gravel, 6 mil sheet plastic, 2″ of styrofoam insulation, 6″ square metal wire grid and then the multitude of…

  • Read More  

    And Then There was Light

    3380 Craigend

    Famous words and a welcome addition to a basement bedroom. Even though a window is not a safety requirement (since we will have a sprinkler system installed) everyone generally prefers…

  • Read More  

    Wine Room

    3380 Craigend

    Steve was brought in once again to core a few holes in the concrete so that bottles of wine can be stored at an even temperature along side the exterior…

  • Read More  

    More Forms

    3380 Craigend

    The forms for the first major round of our retaining walls have been set up.  Everything looks pretty massive and will continue to do so until we soften things months…

  • Read More  

    Ready for the Walls

    3380 Craigend

    Poured the footing yesterday, stripped today and the forming crew started the daunting task of setting up for the next stage. 17-20′ walls need to be built to get to…

  • Read More  

    Drainage

    3380 Craigend

    Everyone needs good drainage away from their home and with seven bathrooms in the house it becomes even more important. The plumbers passed the first round of this test today. 

  • Read More  

    Waterproof?

    3380 Craigend

    Hopefully. We now have at least one layer of a torch-on style roofing product on all the main areas. This should keep the moisture away from all our wood products…

  • Read More  

    Retaining 

    3380 Craigend

    We have started the actual footing for the first (of many) retaining walls.  After extensive structural and geotechnical consultations, a massive footing design was agreed upon. Note the extensive rebar…

  • Read More  

    Protection 

    3380 Craigend

    We are starting in earnest on the landscape plan for the back yard. However, when we excavated the variety of materials to prepare for the retaining walls, boulders on the…

  • Read More  

    More View?

    3380 Craigend

    The master bedroom had a 2′ return wall on both sides of the SW corner which is the biggest view area of the room. It quickly became apparent that this…

  • Read More  

    Frame Away

    3380 Craigend

    Things are really starting to come together. Framing is a fun and rewarding segment of the construction schedule as progress is visible on a daily basis. 

  • Read More  

    Hedge anyone?

    3380 Craigend

    We finally tackled the removal of the aged laurel hedge between the two properties. With trunk dimensions over 10″ and plumbing and electrical services in the area, it was a…

  • Read More  

    Steel galour

    3380 Craigend

    Steel beams are up and defining the outer perimeter. It’s going to be a great view from the main floor. 

  • Read More  

    Perfect planters

    3380 Craigend

    We have used lots of plywood so far to form the concrete walls. This round we had to step it up a notch to create architectural concrete walls for the…

  • Read More  

    Sheeted

    3380 Craigend

    A nice milestone. The main floor being sheeted was the final hurdle that will allow the last stage of concrete to continue. The guys now have a great platform to…

  • Read More  

    Slab poured

    3380 Craigend

    The rain held off and the entire suspended slab was poured today. This is a big step in the critical path process as it was necessary in order to start…

  • Read More  

    Scaffold

    3380 Craigend

    We are getting ready to pour the suspended slab decks off the main floor. It is quite a planning process with steel beams, concrete and rebar all being needed to…

  • Read More  

    Would this scare you?

    3380 Craigend

    This large boulder is perched above the exterior deck and the engineers are concerned that an earthquake could bring this down on the deck. As we are all afraid of…

  • Read More  

    It can be done

    3380 Craigend

    Famous words to tell the client. But at a price. For a variety of reasons (we don’t really want to blame anyone) one of the interior concrete walls was poured…

  • Read More  

    Pool Footings

    3380 Craigend

    The next phase of our operation is getting the structure in place for the pool and deck structures. Everything must be excavated down to bedrock to satisfy the requirements of…

  • Read More  

    Backfilled

    3380 Craigend

    Damproofing, drain tile and gravel has been installed so we can now get an excavator to the downhill side of the property to continue with the concrete work. 

  • Read More  

    Fall Colour

    3380 Craigend

    Just a little interlude from the harsher realities of typical site views. Mother Nature showing her vibrant fall colours…

  • Read More  

    Stripped

    3380 Craigend

    The first real round of concrete is complete and the form work  has been stripped. The form materials will largely be re-used in framing the main body of the house.…

  • Read More  

    Forms

    3380 Craigend

    Jamie’s forming crew is a well oiled machine. After a week of work with a group of 8 carpenters, many sheets of plywood and thousands of feet of 2 by…

  • Read More  

    Footings

    3380 Craigend

    The blasting and excavation prep is now complete so the forming crew can get started with the footings. After the blasting debris was cleaned up, we placed a few inches…

  • Read More  

    Line drilling, not dancing

    3380 Craigend

    In order to minimize the potential for blasting more rock than desired, as well as keeping the finished face a little smoother, a technique known as line drilling is used.…

  • Read More  

    Physics class

    3380 Craigend

    It’s interesting to note that, along with the quantity of nitro put in each hole, there are different explosive timers on the colour coded blasting caps. The purpose of this…

  • Read More  

    More Drilling

    3380 Craigend

    Looks like we will be using all of our 10 days to drill and blast. With each hole 3-4′ deep, the guys can get up to 50 holes blasted in…

  • Read More  

    Working out

    3380 Craigend

    We have 10 working days to complete the blasting and the boys are working hard to get it done. So far so good. Imagine working out 8 hours a day…

  • Read More  

    It’s GO time!

    3380 Craigend

    During the excavation, the much anticipated basement bedrock was exposed and quickly determined what could or couldn’t be removed by conventional methods.  A blasting permit was applied for and the…