The next phase of our operation is getting the structure in place for the pool and deck structures. Everything must be excavated down to bedrock to satisfy the requirements of the geotechnical engineer. Being a relatively steep site, this is a tricky procedure as the footings must be placed first in an attempt to level out the structure for the future walls.